Box 11 - 017360
[return to top]
[A07-07]
FF - Code Consultants Agreements, 1996
FF - Payments, 1995-1998
FF - U-2-00115-5140 Paid, FY 1989-1990
FF - Engineering Surveys and Services (ES&S) - Quality Assurance - Payments, 1996-1997
FF - Payments - Face Consultants, 1996-1997
FF - Payments - ES&S - Geotechnical, 1995-1996
FF - Payments - Code Consultants, 1996
FF - Contracts - Phase I, Site Improvement, 1996-1997
FF - Agreements - Peckham Guyton Albers and Viets, 1995-1998
FF - Contractor Payments - Phase I, 1996-1998
FF - Construction 2941-1, 1996
FF - Construction Budget, 1996
FF - Change Orders, Phase I, 1996
FF - Energy Analysis, 1998
FF - Employment Report, 2941-2, 7/1997
FF - Agreements - ES&S - Land, 1994-1996 [includes floppy diskette]
FF - Cost Estimates, 1996
FF - Code, 1996
FF - Agreements - ES&S - Quality Assurance 2941-4, 1996-1997
FF - Payments - ES&S - Land, 1995-1996
FF - Contractor Payments, Phase II, 1996-1997
FF - Miscellaneous Technology, 1996
FF - Agreements - Face Consultants, 1996-1997
FF - Meeting Minutes, 1995-1996
FF - Conner Business Systems, n.d.
FF - Advertisements for Bids, 1996
FF - Advertisements for Bids, 1996 (cont'd)
FF - Correspondence, 1992-1999
FF - Signs, 1997-1999
FF - Board Papers, 1995-1996
FF - A/E Selection, 1994-1995
FF - Site Visits - Photographs, n.d.
FF - Reports (includes Advisory Review Panel for Assessment of Library Needs - UM Library Directors Committee - other libraries), 1994-1997
FF - City of Boonville Missouri, 1994
FF - News Clippings, 1993
FF - Harvard (includes photographs), 1993
FF - UM Libraries, 1993-1994
FF - Other Libraries, 1987-1993
FF - Monthly Employment Report, 1996-1997
FF - Contracts, Phase II, 1996
FF - Meeting Minutes, 1996
FF - Construction 2941-2, 1996-1998
Box 13 - 001443
[return to top]
[A08-04]
FF - Specifications for Lake "A" Renovation (Project #2999), Missouri Research Park, 9/2/1999
FF - Specifications for Lake "A" Renovation (Project #2999), Missouri Research Park, 9/2/1999 (2nd copy)
FF - Request for Categorical Exclusion, Missouri Research Park Overpass Project, 5/30/1997
FF - Agreements, Project #2993-6, 2000
FF - Blueprints, Missouri Research Park, 2000
FF - Contracts, Project #2993-4, 2000
FF - Correspondence, Project #2993-3, 2000
FF - Contract, Project #2993-3, 2000
FF - Payments, Project #2995, 1999-2000
FF - Agreements, Project #2995, 1999-2000
FF - Agreements, Project #2993-7, 2000
FF - Agreements, Project #2996, 1999
FF - Payments, Project #2996, 1999-2001
FF - Payments, Project #2997-1, 1999
FF - Agreements, Project #2997, 1998-1999
FF - Advertisements, Project #4001, 1999
FF - Correspondence, Project #4001, 1999-2000
FF - Payments, Project #4001, 1999-2000
FF - Payments, Project #4001, 2000
FF - Contract, Project #4001, 1999-2000
FF - Agreements, Project #4001, 1999
FF - Payments, Project #4002, 1999
FF - Agreements, Project #4002, 1999
FF - PIF and Monitor Sheet, Project #4007, 2000
FF - Change Orders, Project #4007, 2000
FF - Agreements, Project #4007, 2000
FF - Payments, Project #4007, 2000-2001
FF - Correspondence, Project #4007, 2000-2001
FF - Construction, Project #4007, 2000-2001
Box 14 - 063995
[return to top]
[A08-79]
FF - Missouri Highway and Transportation Department; General Correspondence, 1987-1994
FF - LaSalle; Payments, Proj. 2351-96, 1999-2000
FF - PIF and Monitor Sheet, Proj. 2944-3, 2003
FF - CM Engineering Agreement, Proj. 2944-3, 2002-2003
FF - CM Engineering Payments, Proj. 2944-3, 2002-2003
FF - Schirmer Engineering Agreements, Proj. 2969-00, 1999-2008
FF - Schirmer Engineering Payments, Proj. 2969-00, 2000-2001
FF - Schirmer Engineering Correspondence, Proj. 2969-00, 2000-2001
FF - Schirmer Engineering Payments, Proj. 2969-99, 1999-2000
FF - Schirmer Engineering Agreements, Proj. 2969-01, 2001-2008
FF - Schirmer Engineering Payments, Proj. 2969-01, 2001
FF - Schirmer Engineering Agreement, Proj. 2969-02, 2002-2008
FF - IBC Code Adoption, Proj. 2969-03A, 2003
FF - Code Adoption; PIF and Monitor Sheet, Proj. 2969-03A, 2003
FF - PIF and Monitor Sheet, Proj. 2969-03, 2003
FF - Schirmer Payments; Code Adoption, Proj. 2969-03A, 2003-2004
FF - Schirmer Engineering Agreements, Proj. 2969-03, 2003-2008
FF - Schirmer Engineering, Proj. 2969-03A, 2003-2008
FF - Code Consultants Inc. (CCI) Agreements, Proj. 2970-00, 2000-2001
FF - CCI PIF and Monitor Sheet, Proj. 2970-2, 2002
FF - CCI Agreement, Proj. 2970-2, 2002-2003
FF - Fire Protection/Building Code Consulting; PIF and Monitor Sheet, Proj. 2970-03, 2003
FF - CCI Agreements, Proj. 2970-03, 2003
FF - CCI Payments, Proj. 2970-03, 2004-2005
FF - CCI Agreements, Proj. 2970-01, 2001-2004
FF - CM Engineering Agreements, Proj. 2979, 1998-1999
FF - Correspondence, Proj. 2979, 1998-1999
FF - Agreements, Proj. 2979, 1998
FF - Payments, Proj. 2979, 1998
FF - Correspondence, Proj. 2982-2, 2001
FF - Payments, Proj. Proj. 2982, 1998
FF - Advertisements, Proj. 2989, 1999
FF - Meeting Minutes, Proj. 2989, 2000-2001
FF - Contract (1st Bid), Proj. 2989, 2000
FF - Proj. 2989, Geotechnical Report, 1999
FF - Prevailing Wage, Proj. 2989, 2001
FF - Correspondence, Proj. 2989, 2000-2001
FF - Change Orders, Proj. 2989, 2000
FF - E-mails, Proj. 2989, 2002
FF - Peckham and Wright Payments, Proj. 2989, 1999-2002
FF - Herner Construction Payments, Proj. 2989-2, 2001-2002
FF - Goff Construction Payments, Proj. 2989, 2000
FF - PIF and Monitor Sheet, Proj. 2989, 1999-2000
FF - Peckham and Wright Agreements, 1999-2001
FF - Goff Construction Contracts, 2000
FF - Construction, Proj. 2989, 2000
FF - Construction, Proj. 2989, 2001
FF - Hundley-Whaley Farm, Proj. 2989, 1999
FF - Correspondence, Proj. 2989-2, 2001-2002
FF - E-mails, Proj. 2989-2, 2000-2002
FF - Prevailing Wage, Proj. 2989-2, 2001
FF - Advertisements, Proj. 2989-2, 2000-2001
FF - Change Orders, Proj. 2989-2, 2001-2002
FF - Contracts, Proj. 2989-2, 2001
FF - Construction, Proj. 2989-2, 2002
FF - Project Manual, Hundley-Whaley Learning Discovery Center, Proj. 2989, 1999
FF - Plans, Hundley-Whaley Center, Proj. 2989, 1999
FF - Insignia Financial Group Agreements, Proj. 2991, 1999
FF - Insignia/ESG Payments, Proj. 2991, 1999
FF - Pricewaterhouse Coopers Agreements, Proj. 4005, 1999
FF - Loomis Associates Payments, Proj. 4010, 2000-2001
FF - Loomis Associates Agreements, Proj. 4010, 2000
FF - PIF and Monitor Sheet, Proj. 4010-03-1, 2003
FF - Loomis Associates Payments, Proj. 4010-02, 2002-2003
FF - Loomis Associates Agreements, Proj. 4010-1, 2001
FF - PIF and Monitor Sheet, Proj. 4010-2, 2002
FF - Loomis Associates Payments, Proj. 4010, 2001-2002
FF - Loomis Associates PIF and Monitor Sheet, Proj. 4010-03, 2003
FF - Correspondence, Proj. 4010, 2000-2003
Box 15 - 064159
[return to top]
[A08-79]
FF - George Butler Associates Agreements, Proj. 4029, 2001-2003
FF - Correspondence, Proj. 4029, 2001
FF - GBA Payments, Proj. 4029, 2001
FF - GBA Agreements, Proj. 4029-1, 2001-2002
FF - Plans, Novus R&D Facility, 2001
FF - Correspondence, Proj. 4029-1, 2001-2003
FF - George Butler Associates Correspondence, Proj. 4029-2 (Novus), 2002
FF - George Butler Associates Payments, Proj. 4029-2, 2002
FF - George Butler Associates Agreement, Proj. 4029-2 (Novus), 2001-2002
FF - Novus Approval, Missouri Research Park Design Review Committee, 2008
FF - Plans, Diagraph, Missouri Research Park, 2001
FF - Diagraph, Proj. 4029-3, 2001-2002
FF - George Butler Associates Payments, Proj. 4029-3 (Pohlman Building), 2002
FF - George Butler Associates Agreements, Proj. 4029-3 (Pohlman Building), 2001-2004
FF - George Butler Associates Payments, Proj. 4029-4 (Lot 21-Novus), 2002
FF - MRP Lot 21-Tristar, Proj. 4029-4, 2002
FF - PIF and Monitor Sheet, Proj. 4042, 2002
FF - George Butler Associates Agreement, Proj. 4042, 2002-2005
FF - Providence Point Renovation Correspondence, Proj. 4045, 1999-2003
FF - Miscellaneous Agreements and Contracts, 2003
FF - Loomis Payments, Proj. 4047, 2003
FF - Loomis Agreement, Proj. 4047, 2003
FF - Ft. Wood Lunch Room Modifications, Proj. 4048, 2003
FF - Project Structural Calculations, Linco Office and Research Building, MRP, 2003
FF - Domash Designsource Agreement, Proj. 4048, 2003
FF - Domash Payments, Proj. 4048, 2003-2004
FF - Linco Building, Proj. 4052-2, 2003
FF - George Butler Associates Payments, Proj. 4052, 2003-2004
Box 16 - 007143
[return to top]
[A10-73]
FF - R1076 - UMC Recommendations for Improvements of Power Plant and Distribution Facilities - Executive Summary, Phase I Report & Phase II Report, 1984-1985
FF - R1077 - UMC Sanitary Sewer Extension to Sinclair Farm & Environmental Trace Substance Center, February 1984 (2 Copies)
FF - R1078 - UMC Power Plant Ownership and Operation, June 15, 1984
FF - R1079 - UMC SCADA System Analysis Report, July 13, 1984
FF - R1089 - UMC Electric Power System
FF - R1090 - UMC Power Plant Improvement Program, 1985
FF - R1091 - UMC Electric Distribution System Study Final Report, August 1984, April 1985 - (2 Copies)
FF - R1132 - UMC Hospital Capital Improvement Project Phase II - Surgery Suite Renovation, June 12, 1987
FF - R1137 - UMC School of Law Design Development Code Review, August 23, 1985
FF - R1125 - UMC Hospital Capital Improvements Project Staff Report, April 19, 1988 (2 Copies)
FF - R1124 - UMC Hospital Capital Improvements Project Phase IIB and III Schematic Design, March 1988
FF - R1155 - Review of Consultant Procedures and Design Guidelines, February 1989
FF - R1158 - Space Needs Assessment for Archives, Records Management and University Press, July 1989
FF - R1159 - UMC Johnston and Wolpers Hall Schematic Design Report - HVAC & Electrical Systems, March 9, 1990 (2 Copies)
FF - R1159 - UMC Johnston and Wolpers Hall Schematic Design Report - Improvements, October 5, 1990 (2 Copies)
FF - R1168 - UMC Faurot Field & Memorial Stadium Structural Condition Study, November 1990 (2 Copies)
FF - R1169 - UMC Schlundt Annex Renovation and Expansion Schematic Design Report, April 19, 1991 (2 Copies)
FF - R1157 - UMC Athletic Facilities Master Plan, May 30, 1990 (2 Copies)
Box 17 - 007144
[return to top]
[A10-73]
FF - R1120 - University Research Reactor Upgrade, 1986-1987 [RESTRICTED]
FF - R1106 - UMC Hospital and Clinics Electric System Study - Final Issue, May 1986 (2 Copies)
FF - R1092 - UMC Engineering Lab and Classroom Project Preliminary Design Report, April 1985 (2 Copies)
FF - R1175 - UMC Space Needs Analysis - Greenhouses, January 1991
FF - R1176 - UMC Mark Twain Residence Hall - Exterior Brick Examination Report, August 1991
FF - R1177 - Space Utilization Study, November 1987
FF - R1180 - UMC Interpretive Restoration of Jesse Hall, n.d. (2 Copies)
FF - R1181 - UMC Lee Hills Hall Schematic Design Report, June 1992 (2 Copies)
FF - R1182 - McAlester Hall Renovation Feasibility Study, December 1990
FF - R1184 - UMC Study of Records Management Warehouse Lighting, August 9, 1990 (2 Copies)
FF - R1186 - UMC Health Sciences Center Comprehensive Plan Update Phase I, February 3, 1988 (2 Copies)
FF - R1187 - UMC Capital Improvements Phase II Surgery Suite Renovation - Staff Report, March 1, 1988
FF - R1190 - UMC Turner Ave & Hitt St Parking Structures - Parking Study, September 1989
FF - R1116 - Report on Hard Hat Procedures, January 14, 1987 (2 Copies)
FF - R1112 - UMC Hospital and Clinics Electric System Study Presentation, August 22, 1986
FF - R1107 - UMC Hospital Fire and Building Code Analysis, May 1, 1986
Box 18 - 007146
[return to top]
[A10-73]
FF - R1041 - Feasibility Study of Dalton Research Lab Heat Recovery System, January 1979
FF - UMC Animal Science Research Center Phase III Report, January 31, 1980
FF - R1046 - UMC Research Reactor Facilities Energy Conservation Report, June 1980
FF - R1048 - UMC Teaching Hospital Systems Analysis, October 6, 1980 (2 Copies)
FF - R1196 - MU Physical Planning Progress Report - UMC, UMKC, UMSL, 1984-1985
FF - R1201 - UMC School of Law Project Report, June 3, 1986
FF - R1203 - UMC Hospital and Clinics Capital Improvements Phase I - Progress Report, February 1985
FF - R1204 - UMC Hospital and Clinics Capital Improvements Phase IIb and III, March 1988 and Surgery Suite Renovation, May 1987 Schematic Design Reports
FF - R1206 - Campus and System Administration Preliminary Space Analysis, May 1990 (2 Copies)
FF - R1209 - UMC Schlundt Hall Program Planning Study, n.d. (2 Copies)
FF - R1214 - UMC Structural Report for Roof Wood Truss of Environmental Trace Substance Building, October 1989
FF - R1215 - UMC Landscape Management Plan, January 1990 (2 Copies) and Revised Version, June 1993
FF - R1004 - Land Use Management Plan (2 Copies)
FF - R1005 - UMC Research Park Brochures, 1993
FF - R1122 - UMC College of Agriculture - Forestry, Fisheries & Wildlife Building Schematic Design, December 1987 (2 Copies)
FF - R1126 - Facilities Operating & Capital Improvement Plan, December 1985 (2 Copies)
Box 19 - 007215
[return to top]
[A10-73]
FF - R1138 - UMC Health Sciences Library Preliminary Code Analysis, February 17, 1983
FF - R1152 - Report on Design and Construction Policies and Practices at MU Part I (2 Copies) and II, 1988
FF - R1221 - UMC Ellis Fischel Campus Plan Concepts, October 9, 1991
FF - R1225 - Townsend Hall Renovations - Soil Analysis and Foundation Design Recommendations, August 5, 1992 (2 Copies)
FF - R1228 - UMC Hospital and Clinics - Product Line Data - Rehab Services, June 1988
FF - R1230 - UMC Ophthalmology Clinic Preliminary Design, June 17, 1980
FF - R1231 - University of Missouri Physical Planning Progress Report, 1984-1985 (2 Copies)
FF - R1232 - UMC Cosmopolitan International Diabetes Center Preliminary Design, May 6, 1982
FF - R1233 - UMC Eye Research Facility Preliminary Design Report, March 15, 1983
FF - R1235 - UMC Workshop Report, February 1981 and Workshop Notebook - Arts & Science and Lowry Malls, December 1980
FF - R1239 - UMC Program/Facilities Assessment Phase I - College of Agriculture, October 1983
FF - R1240 - UMC College of Education - Space Needs Analysis, March 1986
FF - R1241 - UMC School of Journalism - Space Needs Analysis, September 1989
FF - R1242 - UMC Libraries Facilities Program Plan, 1981
FF - R1245 - UMC Veterinary Medicine Building East - Renovation, March 30, 1994
FF - R1246 - UMC Office for Student Development - Guideline Space Needs - Residential Life, November 1982
FF - R1150 - UMC Reynolds Alumni Center Schematic Plans, n.d.
FF - R1149 - UMC Vet Med - Clinic Addition Schematic Design & Master Plan (2 Copies) & Addendum (2 Copies), 1989
FF - R1055 - UMC Health Sciences Center Comprehensive Plan Exec Summary (2 Copies), Data Package I - Physical Environmental Context, 1982
FF - UMC Health Sciences Center Data Package II - Institutional Goals, and III - Physical Plant, 1982
Box 24 - 041551
[return to top]
[A10-73]
FF - R3006 UMKC Performing Arts Center Schematic Design Report, January 18, 1973
FF - R3008 UMKC Master Plan, March 15, 1974
FF - R3009 UMKC School of Law Facility Schematic Design, January 22, 1976
FF - R3013 UMKC Multi-Purpose Building, October 24, 1980
FF - R3017 UMKC Rockhill Nelson School for Conservatory & Department of Theater Renovation Schematic Design Report, December 1986 and Feasibility Study, May 18, 1983 (2 Copies)
FF - R3018 School of Business & Public Administration Schematic Design Report, UMKC June 1983, 2Copies) UMC, April 1996
FF - R3028 UMKC Business and Public Administration Building Code Report, July 18, 1988
FF - R3029 UMKC Business and Public Administration Building Plan Review, March 21, 1986
FF - R3034 UMKC Addition to General Library, January 5, 1989 (2 Copies)
FF - R3053 UMKC Elevators for Geosciences, Haag & Newcomb Halls - Schematic Design, April 4, 1994, Design Development Presentation, July 21, 1994, Qualifications Proposal, December 1993, Schematics & Cost Estimates, August 10, 1994 (2 Copies)
FF - R3048 UMKC Facility Plan Phase I, October 1986
Binder - R3043 UMKC Comprehensive Plan Volume I & II, 1983
FF - UMKC Pierson Auditorium Acoustical Report, 1993
Box 26 - 041555
[return to top]
[A10-73]
FF - R4021 - UMSL Computer Center Building Schematic Design Report, August 1989 Original (2 Copies) Replacement, 2 Copies)
FF - R4022 - UMSL Master Planning Council - Natural Bridge Entry Area & Future Improvement Plan, February 4, 1981
FF - R4023 - UMSL Investigative Report & Cost Estimate Woods Hall, Clark Hall, Social Science Building, Main Campus Equipment Replacement, South Campus Equipment Replacement
FF - R4025 - UMSL Exterior Cladding on Tower of Social Science and Business Building, October 9, 1990
FF - R4026 - UMSL Survey and Recommendations for Bookstore, June 25, 1984
FF - R4027 - UMSL Bookstore Project Program and Concepts, 1985
FF - R4028 - UMSL Heating, Ventilating, and Air Conditioning Systems Status, February 6, 1986
FF - R4029 - UMSL Computer Center Building - Life Safety and Fire Protection Analysis, January 25, 1990
FF - R4030 - UMSL Proposal Guidelines for Annual Elevator Maintenance, June 9, 1989
FF - R4031 - UMSL Light Rail Transportation System Informational Report, November 1985
FF - R4033 - UMSL Campus Aerial Photographs, July 20, 1971
FF - R4035 - UMSL Building Safety Survey Phase I, January 4, 1991
FF - R4036 - UMSL Biology Research Greenhouse Schematic Design, July 1992 (2 Copies)
FF - R4039 - UMSL Computer Center Building Schematic Design Report - Replacement, August 1989 (2 Copies)
FF - R4040 - UMSL Metro Link Overview - Bi-State Development Agency, March 22, 1990
FF - R4041 - UMSL Deaconess Hospital Building Condition Report, August 1993
FF - R4042 - UMSL Analysis of Alternative Parking Structure Locations, April 1, 1989
FF - R4043 - UMSL Computer Center Site Plan Analysis, April 28, 1989
FF - R4045 - UMSL South Service Building Feasibility Study, December 18, 1990
FF - R4052 - UMSL General Services Building Assessment, November 8, 1990
FF - R5020 - UMSL Energy Data Analysis FY1993
FF - R5021 - UMSL Quadrangle Chilled Water and Heating System Loop Study, April 1, 1993
Box 27 - 041556
[return to top]
[A10-73]
FF - Report 5018 - Library Storage Facility Predesign Report, 8/21/1995
FF - Report 5018 - Library Storage Facility Predesign Report, 8/21/1995 (cont'd)
FF - Report 5011 - Advisory Panel for Assessment of Library Needs; Final Report, 3/1994
FF - Report 5019 - Library Storage Building Schematic Design Report, 9/1995
FF - Report 5001 - Dynamic Racking Performance of Curtain Wall Glass Elements, 12/1991
FF - Report 5002 - Recommendations for Management of New Construction; Study of Construction Program, 3/1983
FF - Report 5003 - Facilities Planning and Management Review, 7/1984
FF - Report 5008 - Facilities Management Automation Overview, 2/1988
FF - Report 5007 - Program Review, Management of Construction, 4/25/1986
FF - Report 5006 - Recommendations for Management of Construction, 3/1985
FF - Report 5009 - UM Facilities Master Plan, 2/1988
FF - Report 5010 - Campus Facilities Construction Management - An Overview of Construction Management Services, 4/18/1990
FF - Report 5013 - UM Space Study - Options and Opportunities, 9/1990
FF - Report 5014 - Architect/Engineer Fee Review, 2/1988
FF - Report 5015 - UM System; Monsanto's J.F. Queeny Facility - Building Condition Report, 8/1994
FF - Report 5017 - Protective Covenants and Design Guidelines, Missouri Research Park, St. Charles County, 7/1994
FF - Report 5022 - Capital Budget System User's Manual, 11/1989
FF - Report 5023 - Evaluation of Single-Ply Roof Systems, 6/1983
FF - Report 5024 - Roofing Prequalification Requirements and Design Guidelines, 9/1983