UM-System; President's Office; Facilities Management Division; Printed and Duplicated Materials MU stacked logo in yellow and black -- links to main university of missouri at columbia web site MU Libraries -- links to home page of the University Libraries of the University of Missouri at Columbia University Archives -- links to home page of the University Archives of the University of Missouri at Columbia MU stacked logo in yellow and black -- links to main university of missouri at columbia web site University Archives -- links to home page of the University Archives of the University of Missouri at Columbia University of Missouri -- links to home page of the University of Missouri at Columbia spacerHeader graphic

Search

Hours & Contacts

Policies & Procedures

Holdings:
* UM-System
* Columbia

Topical Guides

Online Exhibits

Links
* Archival
* General

MU Libraries


Call Number:
(UW:4/81/8)

Box1-013589

Record Group: 4 UW
Record Sub-Group: 27
Records Title: UM-System; President's Office; Facilities Management Division; Printed and Duplicated Materials
Dates: 1984-1998
Volume: 1 cubic foot, 1.25 linear feet

Scope and Content Note

(A94-105; A98-10; A99-4; A00-172)
This Record Sub-Group contains University of Missouri Facilities Management Division printed and duplicated materials. Included in this Sub-Group are procurement of architectural guidelines, engineering and land-surveying services records, consultant procedures guidelines, design guidelines and minority architect and engineer consultant profiles, initial and final drafts of manuals for policies and procedures, and various other manuals printed by the Facilities Management Division.

Series Descriptions:

This Sub-Group is not divided into separate records series. Arrangement follows the original, topical order.

Inventory

Box 1

FF 1 - Facilities Management Policies and Procedure Manual, 1989-1993: Campus and system responsibilities, UM policy and procedures including planning, budgeting, construction contract supervision, maintenance and operation with revisions through 1993.

FF 2 - Facilities Management Policies and Procedures Manual Volume II Exhibits, ca. 1989-1993: continued.

FF 3 - Facilities Management Policies and Procedures Manual Volume II Exhibits, ca. 1989-1993: continued.

FF 4 - Facilities Management Policies and Procedures Manual, March 1997: loose-leaf notebook arrangement, revised with exhibits.

FF 5 - Board Document Preparation Manual, January 1996: Guidelines regarding preparation and Board of Curators Papers, revised.

FF 6 - Design Project Management Manual, January 1996: Manual for project managers responsible for scope, time and budget of design of UM construction projects greater than or equal to $100,000.

FF 7 - Consultant Procedures and Design Guidelines, June 1989: Arranged for a loose-leaf notebook for use by architectural and engineering firms when working for MU.

FF 8 - Consultant Procedures and Design Guidelines, June 1989: continued from above.

FF 9 - Consultant Procedures and Design Guidelines, July 1989: revision of above.

FF 10 - Process for the Procurement of Architectural, Engineering and Land Surveying Services, 1985: This manual covers the procurement process and related questionnaires and forms.

FF 11 - Consultant Procedures and Design Guidelines, 1994: This manual covers procedures, guidelines, contract documents, specifications, consultant agreements, terms and definitions, proposal forms and order requests.

FF 12 - Minority Architect and Engineer Consultant Profiles, 1983-1996: This folder contains lists of minority architectural and engineering firms in Missouri, as well as filled architect and engineer questionnaires.

FF 13 -Consultant Procedures and Design Guidelines, 1997 with 1998 supplements: This manual covers procedures, guidelines, contract documents, specifications, consultant agreements, terms and definitions, proposal forms and order requests (first of three).

FF 14 - Consultant Procedures and Design Guidelines, 1997 with 1998 supplements: This manual covers procedures, guidelines, contract documents, specifications, consultant agreements, terms and definitions, proposal forms and order requests (second of three).

FF 15 - Consultant Procedures and Design Guidelines, 1997 with 1998 supplements: This manual covers procedures, guidelines, contract documents, specifications, consultant agreements, terms and definitions, proposal forms and order requests (third of three).

Search our Holdings

MU Homepage Archives Homepage Top of the Page Send us E-Mail

Copyright © Curators of the University of Missouri 1997 - 2002
Published by: University Archives muarchives.missouri.edu/
Originally Prepared by Ligaya Luz: December 1998
Revised: 28 January 2002
URL: https://muarchives.missouri.edu/uw-rg4-s27.html

An equal opportunity/access/affirmative action/pro-disabled and veteran employer.
DMCA and other copyright information.