MU Rec Services & Facilities Summer 2003 Handbook The Rothwell-Brewer Project Fact Sheet 2003 Expanding, Renovating & Restoring Student Rec Facilities For The Next 100 Years architects Hastings + Chivetta Architects, Inc. St. Louis, Missouri aquatics consultant Councilman/Hunsaker, St. Louis, Missouri referendum consultant Leisure Vision, Olathe, Kansas interior design concepts MizzouRec, University of Missouri virtual tour Animagic Productions, Inc., St. Louis, Missouri engineers Zanbrana Engineering, Inc., St. Louis, Missouri Bob D. Campbell & Co., Kansas City, Missouri McClure Engineering, St. Louis, Missouri contractor River City Construction, Peoria, Illinois project manager Robert D. Swanson, University of Missouri construction manager Dave Bowman, University of Missouri MU System manager Greg Neuner, MU System department representatives Diane Dahlmann & Daniel J. Shipp vice chancellor of student affairs Dr. Catherine C. Scroggs website mizzourec.com the project The Rothwell-Brewer Project, is the largest recreation project in the history of Missouri higher educa- tion and one of the top five projects in the country. the funding As approved by the students of the University of Missouri by referendum in October of 2001, a fee of an additional $75/semester was confirmed for the construction and renovation of the Rothwell- Brewer-Student Rec Center complex project and facility history Rothwell Gymnasium was opened in 1905 with additions in 1939 and 1959. Brewer Fieldhouse was opened in 1929 with the rec center addition completed in 1989. The completion of The Brewer Project 2005 will coincide with the centennial year of Rothwell Gymnasium. Architectural features from Rothwell Gymnasium will be incorporated in the new design whenever possible. New uses for the original doors, floors and ceiling have been considered and included in the project. Rothwell Gymnasium and Brewer Fieldhouse were the original homes for the Mizzou Tigers. March 18, 2003 The project will be completed in academic year 2004-2005 $43,000,000 Furnishings & Equipment: $1,500,000 The Brewer Project will yield 293,000 gross square feet (115,000 gross square feet of new construction.) it will be one of the top ten largest higher education recreation facilities in the nation. 50M Competitive Pool with seating for 1000 Club Locker Rooms Club Pool with custom features (grotto, waterfall, vortex, spa tub, etc.) Climbing & Bouldering Wall Formal Conference Suite Outdoor Spa Pool Meeting Room w/ exterior balcony High Tech Fitness Club (18,000 GSF) Downtown Brewer w/ Spa, Personal Performance Heavy-lifting gym Shop, Martial Arts Studio & Squash Courts Jungle Themed Lobby Universal Sound, Fiber Optics, Security Red Hall Beverage Co. Stations & Exit Monitors Team Mizzou HQ Wireless Technology Performance Studios (3) 100% Air Conditioning